Thursday, March 21, 2013

Flooring is on the way

I just left with a trailer load of hardwood and tile for the Lot 14 house.  I can't wait to show off the finished project.  The time is almost here!    I'll just say the homeowners made some nice selections and had help with the interior design from The Flooring and Design Center. 

Sunday, March 10, 2013

Orangefield continues....and Rock Creek Ridge begins

The slab was poured for the Orangefield project on 3/2.  Everything went well.  After working with the same concrete crew for several jobs, we have it down to a science.  It makes things go so much smoother when you know who you're dealing with and know they do quality work every time. 



I am also starting to work on a house in Rock Creek Ridge in Lumberton.  This subdivision offers estate size lots and lots of wooded property.  The lot we are building on even has a creek in the back.  Click here to see the website for the subdivision.

This first picture was supposed to show the neighborhood and give you an idea of the size of the lots...not highlight the port-a-john.  Sorry about that.
This house is rather large at 3,900 sq ft so the slab is larger than most I have done.
Not a problem for Lake Livingston Concrete.  We had it all poured in a few hours and I was back at home enjoying my Saturday with the family.